Activity partition construction and customizing standards:
1. customers provide indoor floor plan and indicate the location of hotel partition. The designer will draw up the best design plan and offer the price according to the customer's location and requirements.
2. the customer confirms the design proposal and quotation, and the two sides sign the contract.
3. the company arranges technical personnel and installation personnel to install the site, and the guides and hardware fittings are sent to the installation site when colleagues.
4. after entering the field, technicians and installers will communicate well with the site leaders, place the line at the scene according to the drawings, and start the installation of the track after confirmation by the customer. (the road rail will use the national standard angle steel from the ceiling of the ceiling to weld and reinforce the screw, and the track will be welded with the proper distance of the angle code and the track rail, so that the bearing capacity of the track is best.)
After the 5. rail installation, the technicians will measure the height and width of the site and confirm it by the customer.
6. professional designers design door panels according to the site.
7. the factory makes the door panels according to the drawings provided by professional designers.
8. after receiving the customer's door panel notification, the door panel will be transported to the site for installation, and the whole project will be completed.
Several steps of the installation of active partition
A good activity partition system, besides having a good activity panel, is more important in construction and installation. Here, the partition designer introduces the seven stages of the installation process of the partition.
1. observation of the construction environment
The investigation and construction environment is the first must. The main purpose of the investigation and construction environment is to determine the site without installation conditions, record the position of the beam and column of the roof, the position of the air conditioning pipe system and so on to customize the final construction plan. The most suitable time for construction is before the venue is renovated.
2 Measurement and positioning
According to the construction drawing, the position control line of the movable partition is released on the indoor floor, and the position line of the partition wall is led to the side wall and the roof. The installation position of the fixed part should be ejected when the line is shot. The installation height of the track must be discussed with the construction team installing smallpox, otherwise it will cause great trouble.
Installation of 3. steel structure and track fixed parts
Steel structure is a load-bearing structure connecting the roof and track. The steel structure involves the safety of the whole movable partition system, so we must not take it lightly. According to the construction drawing, pull the detonating screws on the roof, then fix the angle iron. The track fixings are selected according to the design requirements. Before installing the track, we should consider the closing of the wall, the ground and the ceiling, and facilitate the installation of the active partition wall. By calculating the weight of the active partition wall, the load of the track and the specifications and fixed ways of the embedded parts are determined. The embedded parts of the track must be firmly installed, and the track should be firmly fixed with the main structure. All metal parts should be rust protected.
4. installation orbit
(1) suspended track: the fixed way of suspension is to install pulley on the top of the partition fan and connect it to the upper suspension track. The track and pulley shall be selected according to the load and weight. The light movable partition wall is fixed on the top wooden frame or steel frame by wood screws or screws. The heavy duty movable partition is fixed on the steel skeleton by screwing screws or welding.
2. Supporting track: the supporting way is that the pulley is in the lower part of the partition board, and the ground track forms the lower supporting point. The track is fixed with the expansion bolt or the track embedded parts, and the guide rail is mounted on the top wood frame.
(3) when installing the track, the pulley or track should be installed in advance according to the specific conditions of the track (usually by 1/2 wall).
5 install active panel
According to the installation method, the pulley alignment is accurately drawn on each panel, and then the fixing frame of the pulley is fixed on the top or bottom of the partition fan with screws. Then the panels are loaded into the track individually, adjusting the panels perpendicular to the ground, and pushing and pulling flexibly. Finally, all the fans are connected and fixed. Usually, the adjacent panels are connected by hinge.
6. decorating
Face the design according to the design requirements. Generally, soft bags, mounted cold mounted solid wood panels, decorative panels, glazing and so on. After finishing, finish painting or finishing. Decorative decoration construction is carried out according to the corresponding two criteria.
7. debug
After the installation of the movable panel, the details of the panel height and sealing should be adjusted. After debugging, the site will be cleared and the installation work completed.